Project Description

Muscat Hills 2 Project

Project Details

Location: Muscat Hills

Area: 98 square meters

Scope of Work

  • Procurement and installation of gypsum walls with painting
  • Installation of TV and related décor
  • Procurement and fabrication of coffee table
  • Procurement and installation of glass entrance door
  • Procurement and installation of staff office entrance door
  • Procurement and installation of AC ducting and insulation
  • Electrical wiring for lighting and power outlets
  • Procurement and installation of ceiling lighting fixtures
  • Installation of management and staff office desks
  • Installation of marble sheets
  • Procurement and installation of management office décor
  • Installation of light strips on office walls
  • Ceiling painting
  • Thermal insulation
  • Installation of CCTV cameras
  • Procurement and installation of kitchen hood
  • Procurement and installation of kitchen sink
  • Closet and cabinet construction
  • Design and installation of company logo
  • Plumbing system adjustments

Challenges

  • Due to the client’s urgency to complete the project, the SIP execution team developed and delivered a precise schedule.
  • Given the uneven walls and flooring, final execution was aligned with the detailed plans prepared by the SIP team.
  • The project site posed limitations due to noise, dust, and location sensitivity.
  • The client had specific preferences regarding the quality and color of the wood materials; after consulting with SIP’s engineering team, the execution timeline was slightly extended to meet expectations.